*|MC:SUBJECT|*

Aloha!

We look forward to seeing you tomorrow morning! We just got word of a few road closures that might affect your travel time and have decided to pass this information along. Please take a look at the highlighted sections on the Department of Transportation's announcement below to decide if you will need adjust your travel time.  

As a reminder, the seminar check-in table will open at 8:30 am. The seminar begins at 9:00 am.

See you soon!

The Graham Team

Bonnie Oda, Director of Client Care 
Graham Builders, Inc.
1144 Young Street, Honolulu, HI 96814
808-593-2808 Business
808-534-7858 Direct Line
808-681-7458 Fax
E-mail:  bonnie@grahambuilders.com
Website: https://www.grahambuilders.com
 
“Celebrating
more than 28 years of Unsurpassed Design-Build Excellence in Hawaii”


For Immediate Release: Aug. 1, 2019

DEPARTMENT OF TRANSPORTATION

DAVID Y. IGE
GOVERNOR
 
JADE T. BUTAY
DIRECTOR

19-0381
 
OAHU LANE CLOSURES
FOR THE WEEKEND OF AUG. 2 – AUG. 4
 
PLEASE NOTE:
Lane closure schedules may change at any time without further notice. 
All projects are weather permitting.
 
--- H-1 FREEWAY ---


1) HONOLULU

24-hour shoulder closure on the H-1 Freeway in the westbound direction between the Nuuanu Avenue overpass and Liliha Street overpass on Friday, Aug. 2, through Friday, Aug. 9, for guardrail and shoulder improvements.
 
2) HONOLULU ()
24-hour shoulder closure on the H-1 Freeway in the eastbound direction in the vicinity of the Liliha Street overpass on Friday, Aug. 2, through Friday, Aug. 9, for guardrail and shoulder improvements.
 
3) HONOLULU ()
Two right lanes closed on the H-1 Freeway in the westbound direction between the Punchbowl Street onramp and the Palama Street offramp (Exit 20C) on Sunday night, Aug. 4, through Friday morning, Aug. 9, from 9 p.m. to 4 a.m., for guardrail and shoulder improvements. The School Street onramp to the H-1 Freeway westbound will be closed on Tuesday night through Friday morning.
 
4) HONOLULU ()
Two right lanes closed on the H-1 Freeway in the eastbound direction between the Liliha Street overpass and the Palama Street overpass on Sunday night, Aug. 4, through Friday morning, Aug. 9, from 9 p.m. to 4 a.m., for guardrail and shoulder improvements.
 
5) HONOLULU (WEEKEND/NIGHT WORK)
Roving alternating lane closure on the H-1 Freeway in both directions in the vicinity of the Punahou Street overpass on Friday night, Aug. 2, through Saturday morning, Aug. 3, from 9:30 p.m. to 4 a.m., for sign and marking work.
 
6) WAIMALU TO AIEA (WEEKEND WORK)
Shoulder closure on the H-1 Freeway in the eastbound direction between the Pearlridge/Waimalu offramp (Exit 10) and the Aiea Heights Drive overpass on Saturday, Aug. 3, from 7 a.m. to 7 p.m., for shoulder widening work. The shoulder will be closed.
 
For more information, please visit the project website at http://h1waimalu.com/
 
 
--- FARRINGTON HIGHWAY (ROUTES 93/930) ---
 
1) MAKAHA ()
Alternating lane closure on Farrington Highway (Route 93) in both directions between Leihoku Street and Kaukama Road on Sunday night, Aug. 4, through Friday morning, Aug. 9, from 9 p.m. to 4 a.m., for utility installations. Traffic will be contraflowed. 
 
2) WAIANAE ()
Alternating lane closures on Farrington Highway in both directions between Kili Drive and Kimo Street on Sunday night, Aug. 4, through Friday morning, Aug. 9, from 9 p.m. to 4 a.m., for striping work.
 
 
--- KAHEKILI HIGHWAY (ROUTE 83) ---
 
1) KANEOHE (WEEKEND WORK)
Shoulder closure on Kahekili Highway (Route 83) in the southbound direction in the vicinity of Ahuimanu Road on Sunday, Aug. 4, from 8:30 a.m. to 1 p.m., for maintenance work. Parking will not be available.
 
 
 
--- KAMEHAMEHA HIGHWAY (ROUTES 80/83/99) ---
 
1) PEARL CITY (24-HOUR WORK)
Lane shift on Kamehameha Highway (Route 99) in both directions between Waihona Street and Acacia Road on Friday, Aug. 2, through Friday, Aug. 9, over a 24-hour period, for The Rail project. Eastbound traffic will be detoured to Kuala Street.
 
Please visit The Rail’s project website for more details at http://www.honolulutransit.org/.
 
 
--- PALI HIGHWAY (ROUTE 61) ---
 
1) NUUANU TO KANEOHE (WEEKEND AND WEEKLY CLOSURE)
Closure of the Pali Highway (Route 61) in both directions between Waokanaka Street and Kamehameha Highway for slope stabilization. Pali Highway Sunday through Friday access hours are:
 
  • Honolulu-bound AM contraflow from 5 a.m. to 11:30 a.m.
  • Kailua-bound access from 12:30 p.m. to 7 p.m.

 
2) KALIHI (WEEKEND/NIGHT WORK)
Closure of the Punchbowl Street onramp to Pali Highway (Route 61) in the Kailua-bound direction on Sunday night, Aug. 4, through Friday morning, Aug. 9, from 7 p.m. to 2:30 a.m., for the Pali Highway Resurfacing project. Motorists will be detoured at Vineyard Boulevard.
 
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
 
3) KALIHI (WEEKEND/NIGHT WORK)
Closure of the Pali Highway offramp (Exit 21B) in from the H-1 Freeway in the westbound direction on Sunday night, Aug. 4, through Friday morning, Aug. 9, from 7 p.m. to 2:30 a.m., for the Pali Highway Resurfacing project. Motorists will be detoured to the School Street offramp (Exit 21A) as an alternate route.
 
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
                                                                                                                                4) NUUANU (WEEKEND/NIGHT WORK)
Right lane closure on the Pali Highway (Route 61) in the Kaneohe-bound direction between Waokanaka Street and Upper Nuuanu Pali Drive on Sunday night, Aug. 4, through Friday morning, Aug. 9, over a 24-hour period, for the Pali Highway Resurfacing project.
 
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
 
5) NUUANU (WEEKEND/NIGHT WORK)
Closure of the Pali Highway (Route 61) in the Honolulu-bound direction between the Wylie Street overpass and Pauoa Road offramp on Sunday night, Aug. 4, through Friday morning, Aug. 9, from 6:30 p.m. to 2:30 a.m., for the Pali Highway Resurfacing project. One lane will be tentatively closed from 2:30 a.m. to 5 a.m. Detour signs to Wylie Street and Nuuanu Avenue will be posted.
 
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
 
6) NUUANU (WEEKEND/NIGHT WORK)
Lane closure on the Pali Highway (Route 61) in the Kailua-bound direction between the Pauoa Road underpass and Wylie Street overpass on Sunday night, Aug. 4, through Friday morning, Aug. 9, from 8:30 p.m. to 2:30 a.m., for the Pali Highway Resurfacing project. One lane will be tentatively closed from 2:30 a.m. to 5 a.m.
 
For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org
 
 
--- ALA MOANA BOULEVARD ---
 
1) HONOLULU (WEEKEND WORK)
Lane closure on Ala Moana Boulevard in both directions between Kamakee Street and and Bishop Street on Saturday, Aug. 3, from 6 a.m. to 11 a.m., for electrical maintenance.
 
--- KEAHUMOA PARKWAY ---
 
1) KAPOLEI (24-HOUR WORK)
Shoulder lane closure on Keahumoa Parkway in the westbound direction between Maunakapu Street and Kualakai Parkway on Friday, Aug. 2, through Friday, Aug. 9, over a 24-hour period, for The Rail project. One or two lanes in the westbound direction may be closed from 8:30 a.m. to 3 p.m.
 
For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.
 
 
--- SAND ISLAND ACCESS ROAD ---
 
1) KALIHI (WEEKEND/NIGHT WORK)
Left lane closure on Sand Island Access Road in the southbound direction in the vicinity of Hoonee Place on Sunday, Aug. 4, through Friday, Aug. 9, from 8:30 a.m. to 3 p.m., for maintenance work.
 
 
--- KALIHI STREET (ROUTE 63) ---
 
1) KALIHI ()
Lane closures on Kalihi Street (Route 63) in both directions between Nimitz Highway and School Street on Sunday night, Aug. 4, through Friday morning, Aug. 9, from 7 p.m. to 4:30 a.m., for manhole work. Two lanes will remain open at all times.
 
 
--- MIDDLE STREET ---
 
1) KALIHI (SIDEWALK AND BIKE PATH CLOSURE)
The west shared use walkway and bike path are closed on Middle Street between North King Street and Kamehameha Highway on Friday night, Aug. 2, through Friday night, Aug. 9, over a 24-hour period, for the Middle Street pavement reconstruction project. Pedestrians are directed to use the east sidewalk.
 
 
 
For Immediate Release: Aug. 1, 2019
19-0382
 

Patricia Wong
Information Specialist
Hawaii Department of Transportation
869 Punchbowl St. 96813
(808) 587-2160
Patricia.B.Wong@hawaii.gov

Copyright © 2018 Graham Builders, Inc, All rights reserved.

Our mailing address is:
1144 Young Street
Honolulu, HI 96814

For more information please call Bonnie at 808.593.2808.

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.






This email was sent to *|EMAIL|*
why did I get this?    unsubscribe from this list    update subscription preferences
*|LIST:ADDRESSLINE|*

*|REWARDS|*